Husky granted 30-day extension for report on cause of spill
Husky Energy has another month before presenting official conclusions on the cause of this summer’s oil spill.
The energy giant was granted a 30-day extension yesterday by the Saskatchewan Ministry of the Economy for the submission of their technical reports on the failure the pipeline which leaked oil into the North Saskatchewan River in July.
Assistant Deputy Minister Doug MacKnight told reporters the additional time was needed “to complete a metallurgic report on the failed pipeline, as well as a geotechnical study and report on the lands where the failure occurred.”
MacKnight said a third-party contractor is preparing both reports.