Major construction in Midtown begins Monday
Work on a $1.9 million infrastructure upgrade to a Midtown street is scheduled to begin Monday.
City crews will replace the 110-year-old cast iron water main running below 12th Street E. from Second Avenue to Sixth Avenue E. with PVC pipe – the modern standard.
“[The existing water main] has far exceeded its life expectancy,” capital projects manager for the City of P.A., Nykol Miller told paNOW. “The new water main will provide a stable water source for the residents.”
The city will also replace 39 lead service connections from the water main to the property line, widen the roadway, repave the street and install new concrete curbs and sidewalks.